Irrigation
and Drainage Projects
- Projects completed before the year 1990
| Name of the Project |
Client |
Contract Year |
Completion Year |
| Aşağı Aksu |
Suta |
1983 |
1987 |
| Muş Ulusu |
Ataman |
1985 |
1987 |
| Palu Kovancılar |
Kolin |
1985 |
1987 |
| Dinar Karakuyu |
Talip Kahraman |
1985 |
1987 |
| Çardaklı |
Ziya Çarmıklı |
1986 |
1986 |
| Ağrı Patnos |
Peker |
1986 |
1990 |
| Kığı Adaklı |
Turan |
1986 |
1991 |
| Mercan Konakbaşı |
Ziya Çarmıklı |
1986 |
1990 |
- Projects completed after the year 1990
| Name
of the Project |
Patnos
Şekerova Irrigation |
|
Location
|
Ağrı
|
|
Owner
|
State Hydraulic Works
|
|
Status
|
As Joint Venture with Sepa, Pilot is Sepa
|
|
Contract Date
|
08/03/1991
|
|
Contract Value
|
US $ 119.000,-
|
|
Completion Date
|
20/03/1992
|
|
Brief Description of Scope
|
Irrigation Project for 18207 ha agricultural
land
Gravity and pumping irrigation
Main canals trapezoidal concrete open canals
Irrigation network with secondary and tertiary
open channels
|
| Name
of the Project |
Urfa
Pilot Land Irrigation |
|
Location
|
Urfa
|
|
Client
|
Aydeniz Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract Date
|
01/04/1993
|
|
Completion Date
|
2000
|
|
Brief Description of Scope
|
Irrigation Project for 3000 ha agricultural land
Irrigation network with pipes
|
| Name
of the Project |
Kayacık
Irrigation |
|
Location
|
Gaziantep
|
|
Owner
|
State Hydraulic Works
|
|
Contract Date
|
05/04/1993
|
|
Contract Value
|
US $ 159.000,-
|
|
Completion Date
|
30/04/1994
|
|
Brief Description of Scope
|
Irrigation Project for 14740 ha agricultural
land
Gravity irrigation
Main canals trapezoidal concrete open canals
Irrigation network with pipes
|
| Name
of the Project |
Van
Karasu Akbulak Irrigation |
|
Location
|
Van
|
|
Client
|
Aydeniz Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract Date
|
1991
|
|
Contract Value
|
US $ 1.469.000,-
|
|
Brief Description of Scope
|
Irrigation Project for 17700 ha agricultural
land
Gravity irrigation
Main canals trapezoidal concrete open canals
Irrigation network with secondary and tertiary
open channels
|
| Name
of the Project |
Dicle
Kralkızı Irrigation |
|
Location
|
Diyarbakır
|
|
Client
|
Ceylan Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract Date
|
1993
|
|
Contract Value
|
US $ 1.262.000,-
|
|
Brief Description of Scope
|
Irrigation Project for 23085 ha agricultural
land
Gravity irrigation
Main canals trapezoidal concrete open canals
Irrigation network with secondary and tertiary
open channels
|
| Name
of the Project |
Batman
Left Bank Irrigation |
|
Location
|
Batman
|
|
Client
|
Günfer Joint Venture
|
|
Owner
|
State Hydraulic Works
|
|
Contract Date
|
1993
|
|
Contract Value
|
US $ 1.548.000,-
|
|
Brief Description of Scope
|
Irrigation Project for 18758 ha agricultural
land
Gravity and pumping irrigation
Main canals trapezoidal concrete open canals
Irrigation network with pipes
|
| Name
of the Project |
Demirdöven
Irrigation |
|
Location
|
Erzurum
|
|
Client
|
Mapa Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract Date
|
1995
|
|
Contract Value
|
US $ 541.000,-
|
|
Brief Description of Scope
|
Irrigation Project for 8293 ha agricultural land
Gravity irrigation
Main canals trapezoidal concrete open canals
Irrigation network with secondary and tertiary
open channels
|
| Name
of the Project |
Çamgazi
Irrigation |
|
Location
|
Adıyaman
|
|
Client
|
Göçay Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract Date
|
1995
|
|
Contract Value
|
US $ 520.000,-
|
|
Brief Description of Scope
|
Irrigation Project for 7414 ha agricultural land
Gravity and pumping irrigation
Main canals trapezoidal concrete open canals
Irrigation network with pipes and also with secondary
and tertiary open channels
|
| Name
of the Project |
Batman
Right Bank Irrigation |
|
Location
|
Batman
|
|
Client
|
Günsayıl Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract Date
|
1996
|
|
Contract Value
|
US $ 1.064.000,-
|
|
Brief Description of Scope
|
Irrigation Project for 18593 ha agricultural
land
Gravity irrigation
Main canals trapezoidal concrete open canals
Irrigation network with pipes
|
| Name
of the Project |
Adatepe
and Karakuz Irrigation |
|
Location
|
Kahramanmaraş
|
|
Client
|
State Hydraulic Works
|
|
Owner
|
State Hydraulic Works
|
|
Status
|
As Joint Venture with Barsu, Pilot is Birlik
|
|
Contract Date
|
1996
|
|
Contract Value
|
US $ 416.000,-
|
|
Brief Description of Scope
|
Irrigation Project for 45813 ha agricultural
land
Gravity and pumping irrigation
Main canals trapezoidal concrete open canals
Irrigation network with pipes and also with secondary
and tertiary open channels
|
| Name
of the Project |
GAP-Gaziantep
Irrigation |
|
Location
|
Gaziantep
|
|
Owner
|
State Hydraulic Works
|
|
Contract Date
|
2000
|
|
Contract Value
|
US $ 538.000,-
|
|
Brief Description of Scope
|
Irrigation Project for 54000 ha agricultural
land
Pumping irrigation
Main canals trapezoidal concrete open canals
Irrigation network with pipes
|
| Name
of the Project |
Kayseri
Bahçelik Dam Irrigation and Drinking Water |
|
Location
|
Kayseri
|
|
Owner
|
State Hydraulic Works
|
|
Status
|
As Joint Venture with Ekatek and Hidro Dizayn,
Pilot is Birlik
|
|
Contract Date
|
2000
|
|
Contract Value
|
US $ 1.228.000,-
|
|
Brief Description of Scope
|
Irrigation Project for 50000 ha agricultural
land
Gravity and pumping irrigation
Main canals trapezoidal concrete open canals
Irrigation network with pipes and also with secondary
and tertiary open channels
Revizon of Planning of Bahçelik Dam
Drinking water supply
|
Pump Stations
| Name
of the Project |
Palu
Pump Station, Palu Kovancılar Irrigation Project
|
|
Location
|
Elazığ – under operation
|
|
Client
|
Kolin Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1985
|
|
Brief Description of Scope
|
Concrete Structure
Building cover area : 308 m2
Number of Units : 4
Pumping Discharge : 5,022 m3/s
Pumping Height : 107 m
Penstock Length : 393 m
Penstock Diameter : 2 x f 1200 mm steel
|
| Name
of the Project |
Patnos
Pump Station, Ağrı Patnos Irrigation Project |
|
Location
|
Ağrı – under operation
|
|
Client
|
Peker Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1985
|
|
Brief Description of Scope
|
Concrete Structure
Number of Units : 5
Pumping Discharge: 1,70 m3/s
Pumping Height: 72 m
Penstock Length: 220 m
Penstock Diameter: f 1200 mm steel
|
| Name
of the Project |
PII
Pump Station, Dicle Kralkızı I.Stage Irrigation
Project |
|
Location
|
Diyarbakır
|
|
Client
|
Ceylan Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1995
|
|
Brief Description of Scope
|
Concrete Structure
Building cover area: 1851 m2
Number of Units : 9
Pumping Discharge: 20,20 m3/s
Pumping Height: 60 m
Penstock Length: 223 m
Penstock Diameter: 3 x f 2200 mm steel
|
| Name
of the Project |
PV Pump
Station, Dicle Kralkızı I.Stage Irrigation Project |
|
Location
|
Diyarbakır
|
|
Client
|
Ceylan Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1995
|
|
Brief Description of Scope
|
Concrete Structure
Building cover area: 1425 m2
Number of Units : 12
Pumping Discharge: 27,00 m3/s
Pumping Height: 30 m
Penstock Length: 150 m
Penstock Diameter: 3 x f 2800 mm steel
|
| Name
of the Project |
Arıtaş
I Pump Station, Adatepe Karakuz Irrigation Project |
|
Location
|
Kahramanmaraş
|
|
Status
|
Birlik-Barsu Joint Venture, Birlik Pilot
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1996
|
|
Brief Description of Scope
|
Concrete Structure
Building cover area: 303 m2
Number of Units : 14
Pumping Discharge: 5,225 m3/s
Pumping Height: 40 m
Penstock Length: 200 m
Penstock Diameter: 1 x f 1700 mm steel
|
| Name
of the Project |
Doğanköy
Pump Station, Adatepe Karakuz Irrigation Project |
|
Location
|
Kahramanmaraş
|
|
Status
|
Birlik-Barsu Joint Venture, Birlik Pilot
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1996
|
|
Brief Description of Scope
|
Concrete Structure
Building cover area: 272 m2
Number of Units : 5
Pumping Discharge: 2,500 m3/s
Pumping Height: 11 m
Penstock Length: 1150 m
Penstock Diameter: 1 x f 1300 mm steel
|
| Name
of the Project |
Tombak
I Pump Station, Adatepe Karakuz Irrigation Project |
|
Location
|
Kahramanmaraş
|
|
Status
|
Birlik-Barsu Joint Venture, Birlik Pilot
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1996
|
|
Brief Description of Scope
|
Concrete Structure
Building cover area: 116 m2
Number of Units : 4
Pumping Discharge: 0,300 m3/s
Pumping Height: 55 m
Penstock Length: 450 m
Penstock Diameter: 1 x f 500 mm steel
|
| Name
of the Project |
Afşin
I Pump Station, Adatepe Karakuz Irrigation Project |
|
Location
|
Kahramanmaraş
|
|
Status
|
Birlik-Barsu Joint Venture, Birlik Pilot
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1996
|
|
Brief Description of Scope
|
Concrete Structure
Building cover area: 215 m2
Number of Units : 8
Pumping Discharge: 1,395 m3/s
Pumping Height: 92 m
Penstock Length: 301 m
Penstock Diameter: 1 x f 950 mm steel
|
| Name
of the Project |
Afşin
III Pump Station, Adatepe Karakuz Irrigation Project |
|
Location
|
Kahramanmaraş
|
|
Status
|
Birlik-Barsu Joint Venture, Birlik Pilot
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1996
|
|
Brief Description of Scope
|
Concrete Structure
Building cover area: 180 m2
Number of Units : 6
Pumping Discharge: 0,900 m3/s
Pumping Height: 92 m
Penstock Length: 315 m
Penstock Diameter: 1 x f 700 mm steel
|
| Name
of the Project |
ÇS2-P1
Pump Station, Çamgazi Irrigation Project |
|
Location
|
Adıyaman
|
|
Client
|
Göçay Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1998
|
|
Brief Description of Scope
|
Concrete Structure
Building cover area: 327 m2
Number of Units : 4
Pumping Discharge: 0,605 m3/s
Pumping Height: 50 m
Penstock Length: 287 m
Penstock Diameter: 1 x f 700 mm steel
|
Diversion Weirs
| Name
of the Project |
Kargı
Diversion Weir, Aşağı Aksu Irrigation Project |
|
Location
|
Antalya
|
|
Client
|
Suta Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1985
|
|
Brief Description of Scope
|
Fixed crest weir
Under operation
|
| Name
of the Project |
Ulusu
Diversion Weir, Muş Hınıs Ulusu Irrigation Project |
|
Location
|
Muş
|
|
Client
|
Hikmet Ataman
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1985
|
|
Brief Description of Scope
|
Fixed crest weir
Under operation
|
| Name
of the Project |
Konakbaşı
Diversion Weir, Konakbaşı Irrigation Project |
| Yeri |
Erzincan |
| Client |
Ziya Çarmıklı |
| İlgili İdare |
State Hydraulic Works |
| Sözleşme Tarihi |
1986 |
| Kapsamın Özeti |
Tirolİşletmede |
| Name
of the Project |
Mercan
Regülatörü, Mercan Sulama Projesi |
|
Location
|
Erzincan
|
|
Client
|
Ziya Çarmıklı
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1986
|
|
Brief Description of Scope
|
Tirol type water intake
Under operation
|
| Name
of the Project |
Adaklı
Diversion Weir, Bingöl Kiğı Adaklı Irrigation Project |
|
Location
|
Bingöl
|
|
Client
|
Turan Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1988
|
|
Brief Description of Scope
|
Fixed crest weir
Under operation
|
| Name
of the Project |
Satıbey
Diversion Weir, Van Karasu Akbulak Irrigation Project |
|
Location
|
Van
|
|
Client
|
Aydeniz Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1991
|
|
Brief Description of Scope
|
Fixed crest weir
Under operation
|
| Name
of the Project |
Gündoğan
Diversion Weir, Kayacık Irrigation Project |
|
Location
|
Gaziantep
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1994
|
|
Brief Description of Scope
|
Fixed crest weir
|
| Name
of the Project |
Büyükdere
Diversion Weir, Pasinler Demirdöven Irrigation Project |
|
Location
|
Erzurum
|
|
Client
|
Mapa Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1997
|
|
Brief Description of Scope
|
Tirol type water intake
|
| Name
of the Project |
Esendere
Diversion Weir, Pasinler Demirdöven Irrigation Project |
|
Location
|
Erzurum
|
|
Client
|
Mapa Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1997
|
|
Brief Description of Scope
|
Troll type water intake
|
| Name
of the Project |
Tımar
Diversion Weir, Pasinler Demirdöven Irrigation Project |
|
Location
|
Erzurum
|
|
Client
|
Mapa Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1997
|
|
Brief Description of Scope
|
Troll type water intake
|
| Name
of the Project |
Pasinler
Diversion Weir, Pasinler Demirdöven Irrigation Project |
|
Location
|
Erzurum
|
|
Client
|
Mapa Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1997
|
|
Brief Description of Scope
|
Crest with gates
|
| Name
of the Project |
Çakal
Diversion Weir, Çamgazi Irrigation Project |
|
Location
|
Adıyaman
|
|
Client
|
Göçay Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1998
|
|
Brief Description of Scope
|
Fixed crest weir
Under operation
|
| Name
of the Project |
Kırkgöz
Diversion Weir, Çamgazi Irrigation Project |
|
Location
|
Adıyaman
|
|
Client
|
Göçay Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract date
|
1998
|
|
Brief Description of Scope
|
Troll type water intake
|
Dam Projects
| Name
of the Project |
Hamzadere
Dam Project |
|
Location
|
Edirne
|
|
Client
|
Mapa Construction
|
|
Owner
|
State Hydraulic Works
|
|
Contract Date
|
1998
|
|
Contract Value
|
US $ 293.000,-
|
|
Brief Description of Scope
|
Earth-fill
Off-stream type
Crest length 3945 m
Height from foundation 47.70 m
Right Bank sliding sluice reservoir feeding purpose
F 3.00 m L= 710 m
Left Bank sliding sluice irrigation purpose F
3.50 m
L= 675 m
Minumum reservoir volume 11.000 hm3
Maximum reservoir volume 211.000 hm3
|
Conveyance Pipeline Projects
| Name
of the Project |
Client |
Contract
Year |
Completion
Year |
|
Ankara Water Supply
|
Kutlutaş
|
1987 |
1987 |
|
Diyarbakır Water Supply
|
Diyarbakır Municipality
|
1992 |
1992 |
| Name
of the Project |
Gaziantep
Drinking Water Supply 3rd Stage Project |
|
Location
|
Gaziantep
|
|
Client
|
Mapa Construction
|
|
Owner
|
Gaziantep Municipality
|
|
Contract Date
|
1998
|
|
Contract Value
|
US $ 127.000,-
|
|
Brief Description of Scope
|
54 km of steel pipeline with diameter of 1800
mm
3 concrete water storage tanks with the capacities
of 5000 , 2500 and 2500 m3
|
| Name
of the Project |
Soda
Plant Cooling Water Supply Project |
|
Location
|
Mersin
|
|
Owner
|
Soda Industry
|
|
Contract Date
|
2001
|
|
Contract Value
|
US $ 59.300,-
|
|
Brief Description of Scope
|
28 km of steel and CTP pipeline with diameter
of 600 mm
Pump station and water intake structure
|
|